Canberra’s Construction Cleaning Specialists
Clean Sites.
Safer
Builds.
25+ years of industry experience behind a structured, stage-by-stage cleaning process that keeps your site safe, your trades efficient, and your handovers stress-free.
25+
Years in Construction
OHS
Compliant Every Clean
10
Cleaning Stages Covered
∞
OHS General Cleans Included
Why Total Site Recycling
Built by builders, for builders.
Stage-by-Stage Process
We follow a structured cleaning schedule aligned with every stage of construction — from site set-up through to final handover — so the right crew with the right equipment is always on site at the right time.
Machine & Crane Capability
Full OHS Compliance
Site Cage Supplied & Managed
Priority Scheduling
Ready for CofO
Our Cleaning Services
Every Stage,
Every Time.
Site Set-Up
Site cage with lid supplied and set up securely by a TSR labourer. Full perimeter clean — back and sides of property — gates and fences checked straight and secure.
Specialised machine crew. Crushed rock spread through driveway and perimeter. Site levelled with soil graded away from slab to eliminate ponding. Vapour barrier pulled up around perimeter. Footpath, crossover and roadway cleaned. Priority scheduling guaranteed.
Crane trucks for rubbish removal. Full perimeter clean, all timber offcuts removed, cage emptied. Plaster bags delivered to garage for plasterers (2x SS, 4x DS).
Crane truck and machine crew. Machine removal of broken roof tiles, excess roof battens and valley board. 10 spare tiles stacked neatly in garage. Full perimeter clean.
Pre-Scaffold Clean (DS)
Machine removal of broken bricks and excess mortar in preparation for scaffold install. Mortar cleaned from base of brickwork. Priority scheduling for scaffold install deadlines.
Machine removal of broken bricks and excess mortar. 20 spare bricks stacked in garage. Brick sand spread on site. Full perimeter clean, cage emptied.
Crane trucks for rubbish and plaster removal. Full perimeter clean, all plaster offcut bags removed from site.
Crane truck and specialised machine crew. Full machine level-off with ground battered from slab. Legal steps built at all external doors. Garage swept clean with spare materials stacked. Cage removal optional. Priority scheduling available when handover date provided.
Supervisors can request OHS general cleans at any point during the build. Ideal for Rough In stage, after Lock Up, or around painting. Full perimeter clean and cage empty each visit.
Our Process
What's included, stage by stage.
Stage One
Site Set-Up
Stage Two
Slab Clean
Stage Three
Frame Clean
Stage Four
Roof On
Stage Five
Pre-Scaffold (DS Only)
Stage Six
Brick / Post-Scaffold (Lock Up)
Stage Seven
Plaster Clean
Stage Eight
Tiling Clean
Stage Nine
Final Clean
Stage One
Site Set-Up
Stage Two
Slab Clean
Stage Three
Frame Clean
Stage Four
Roof On
Stage Five
Pre-Scaffold (DS Only)
Stage Six
Brick / Post-Scaffold (Lock Up)
Stage Seven
Plaster Clean
Stage Eight
Tiling Clean
Stage Nine
Final Clean
Our Commitment
Quality work.
Clean sites.
Happy trades.
OHS Requirements — Always Met
Proactive, Not Just Reactive
25+ Years of Industry Knowledge
Supervisor Flexibility Built In
Canberra's Local Specialists
Important Notes & Site Conditions
Limited, restricted, or no crane and/or bobcat access may incur additional charges — assessed on a per-job basis.
Our fixed price gives you peace of mind and the ability to stay on budget and on time.